Tuesday, March 18, 2008

Tiling






Ensuite tiling is almost complete
















Stainless steel mosaics in kitchen splashback







Wednesday, March 12, 2008

Kitchen cabinets are installed


We now have steps up to the bedrrom level and finally the kitchen cabinets are in place. Its always interesting to see if the designs you chose months ago actually look as good when they're in, and I'm pleased with the way the kitchen has turned out.

Wednesday, February 13, 2008

Internal Linings (in other words.....plasterboard!)

The scaffolding is finally down and work has started on the inside. Insulation was installed last week according to the supervisor. I'll have to take his word for that because I was too busy to check it out. Apparently there was a bit of a flood when a water pipe got in the way of someones saw (its not like they were hidden so don't know how that happened). Anyway its all fixed and back on track and as you can see by the photos the plasterboard is nearly complete. If all goes well, they say another 9 weeks or so to handover.







Kitchen/Family room looking through to rumpus











Kitchen pantry and enlarged fridge space




















Meals area and bifold doors to alfresco












Glass now installed in bifold doors















View from alfresco sans scaffolding, site needs a bit of a cleanup.

Too cloudy to see Blue Mountains today but nice to know they're there.




Sunday, January 20, 2008

Electrical work started

Returned from visiting family in Perth to find that the electrical work has started. Not very exciting photos to look at, although I was excited to find I finally had stairs to get up to the master bedroom instead of having to do a very unladylike clamber up the concrete.

I also found a huge butterfly in one of the bedrooms so I opened the window to let it fly through.